The project will be interconnected via Venture Global’s TransCameron Pipeline, consisting of approximately 24 miles of 42-inch diameter pipeline.
TransCameron Pipeline received FERC authorization in February, 2019 and will extend eastward from the Calcasieu Pass LNG facility to a location near Grand Chenier, Louisiana, where it will interconnect with ANR, TETCO, and Bridgeline Pipelines. Venture Global Calcasieu Pass has contracted long-term, firm, uninterruptible transport capacity on each of the upstream pipelines which will connect TransCameron Pipeline to over 2 BCFD of natural gas supply.